top of page
88888(3).jpg

SUMMIT AGENDA 2027

DAY1

Day 2 Morning: Delivering Data Centres at Scale

09:00 - 09:10 (10 mins)

Welcome Address by Conference Chair

09:10 - 10:00 (50 mins)

[Panel] Solving Europe’s Time-to-Power Challenge: Grid Connections, On-Site Energy and Flexible Capacity
  • Accelerating Grid Connection Timelines for Hyperscale and AI Data Centres
  • How On-site and Distributed Energy Can Bridge Grid Capacity Constraints
  • Using Flexible and Non-firm Grid Connections to Unlock Capacity Faster
  • How time-to-power is reshaping data centre site selection across Europe

10:00 - 10:20 (20 mins)

[Keynote] Reserved for Sponsor
Coffee Break & Networking

10:50 - 11:40

(50 mins)

[Panel] Building the Energy Architecture for High-Density AI Data Centres: Power, Cooling and Heat Integration
  • Designing High-density Power Architecture for Next-generation AI Compute
  • Can Liquid Cooling Become the New Standard for High-density AI Facilities, and What are the Deployment Challenges?
  • How Can Waste Heat from AI Data Centres be Integrated into District Heating Networks and Industrial Energy Systems?

11:40 - 12:00

(20 mins)

[Keynote] Reserved for Sponsor
Luncheon & Networking

Day 2 Afternoon: Financing and Optimising the AI Energy System

14:00 - 14:50  (50 mins)

[Panel] Financing Europe's AI Infrastructure: Investing in Data Centres, Grids and Integrated Clusters
  • The Scale of Capital Required to Build Europe’s Next Generation of AI, Data Centre and Energy Infrastructure
  • How Investors are Evaluating Hyperscale Data Centres as Long-term Infrastructure Assets
  • Financing Transmission, Substations and Grid Expansion to Support Rapidly Growing AI Power Demand

14:50 - 15:10 (20 mins)

[Keynote] Reserved for Sponsor

15:10 - 16:00

(50 mins)

[Panel] Integrating Gigawatt-Scale AI Demand into Europe’s Power System
  • How Europe’s Power System Can Accommodate the Next Wave of Gigawatt-scale AI and Data Centre Demand
  • Using Flexible Connections, Storage and Demand Response to Unlock Additional Capacity
  • How Hyperscalers and Data Centres Can Become Active Participants in the Energy System
bottom of page